{"page":{"id":56,"title":"Cancel or Change Order","handle":"cancel-change-order","url":"https://kinfolktee.com/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-10-04\">October 4, 2026</time></p>\n<section class=\"policy-summary\">\n<h2>Cancellations and changes at a glance</h2>\n<ul>\n<li><strong>Window:</strong> you can cancel or change an order within <strong>24 hours</strong> of placing it, as long as it has not shipped.</li>\n<li><strong>How:</strong> email <a href=\"mailto:support@kinfolktee.com\">support@kinfolktee.com</a> with your order number and the change you need. We reply within 1 business day.</li>\n<li><strong>Refund:</strong> a confirmed cancellation is refunded in full, issued within 7 calendar days of our confirmation.</li>\n<li><strong>Too late to cancel?</strong> You still have 60 days from delivery to return or exchange under our <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges Policy</a>.</li>\n</ul>\n</section>\n<p>Families change plans. A cousin cancels the reunion trip, the baby arrives early and the &#8220;big sister&#8221; shirt now needs a different size, or you notice that the apartment number is missing from Grandma&#8217;s address. This page explains what can still be changed after you click &#8220;Place order&#8221;, how quickly you need to tell us, and what happens to your money if an order is cancelled.</p>\n<h2>1. Why there is a 24-hour window</h2>\n<p>Every Kin Folk Tee piece is printed after you order. Once a shirt has been printed with a design in a particular size and colour, it cannot be turned back into a blank. To give you a fair chance to fix mistakes before that happens, we hold a <strong>24-hour window</strong> from the moment your order is placed. Requests received inside that window are almost always possible, provided the order has not already been printed and shipped.</p>\n<p>After 24 hours, production may have started. We will still do our best, and we will tell you honestly whether a change is possible. If it is not, the return and exchange route remains open once the order arrives.</p>\n<h3>How we measure the window</h3>\n<p>The window starts at the time shown on your order confirmation email and is measured by the time your email reaches us. Weekends and holidays count, so an order placed on Saturday morning can be cancelled until Sunday morning. Because we reply within 1 business day, a request sent within the window is honoured even if our reply comes after it closes.</p>\n<h2>2. How to ask for a cancellation or change</h2>\n<ol>\n<li>Write to <a href=\"mailto:support@kinfolktee.com\">support@kinfolktee.com</a> or use the <a href=\"/submit-ticket/\">Submit a Ticket</a> page.</li>\n<li>Put your <strong>order number</strong> in the subject line, for example &#8220;Cancel order 1234&#8221; or &#8220;Change address on order 1234&#8221;.</li>\n<li>Say exactly what you need: full cancellation, one item removed, a size or colour change, or a corrected address.</li>\n<li>Send it from the email address used at checkout if possible. If you cannot, include the billing name and shipping postcode so we can confirm the order is yours.</li>\n<li>Wait for our confirmation email. A change is only final once we confirm it in writing.</li>\n</ol>\n<p>Please do not place a second order to &#8220;replace&#8221; the first one without telling us. Two orders can end up in production at the same time, and then both will ship.</p>\n<h2>3. Changes we can usually make</h2>\n<table class=\"policy-table\">\n<caption>What can be changed within 24 hours, before shipping</caption>\n<thead>\n<tr>\n<th scope=\"col\">Change</th>\n<th scope=\"col\">Within 24 hours</th>\n<th scope=\"col\">After 24 hours, not yet shipped</th>\n<th scope=\"col\">After shipping</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Cancel the whole order</td>\n<td>Yes</td>\n<td>Only if production has not started</td>\n<td>No; use a return</td>\n</tr>\n<tr>\n<td>Remove one item</td>\n<td>Yes</td>\n<td>Only if that item has not been printed</td>\n<td>No; return that item</td>\n</tr>\n<tr>\n<td>Change size or colour</td>\n<td>Yes</td>\n<td>Only if that item has not been printed</td>\n<td>No; request an exchange</td>\n</tr>\n<tr>\n<td>Correct or change shipping address</td>\n<td>Yes</td>\n<td>Usually yes</td>\n<td>We try with the carrier, no guarantee</td>\n</tr>\n<tr>\n<td>Add an item</td>\n<td>Place a new order</td>\n<td>Place a new order</td>\n<td>Place a new order</td>\n</tr>\n<tr>\n<td>Change to a different design</td>\n<td>Yes, as cancel and reorder</td>\n<td>Only if not printed</td>\n<td>Return and reorder</td>\n</tr>\n</tbody>\n</table>\n<h3>Adding items</h3>\n<p>We cannot add items to an order that has already been paid for, because the payment is fixed when you check out. Just place a second order for the extra items. Shipping is free either way, so splitting it costs you nothing extra. If you want both orders to travel together, mention it in your email and we will try to ship them at the same time.</p>\n<h2>4. If your order has already shipped</h2>\n<p>Once a parcel is with the carrier, we cannot cancel it or change what is inside. You have two options:</p>\n<ul>\n<li><strong>Return or exchange</strong> after delivery, within 60 days, following our <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges Policy</a>. For change-of-mind returns the return postage is paid by you; for our mistakes it is free.</li>\n<li><strong>Address problems in transit:</strong> if the address is wrong, email us immediately. We will ask the carrier whether the parcel can be redirected or held. Whether this is possible depends on the carrier and the destination, so we cannot promise it.</li>\n</ul>\n<p>Please do not refuse delivery of a parcel to cancel an order. Refused international parcels can be destroyed or held at customs, and a refused parcel may take many weeks to reach us, which delays any refund.</p>\n<h2>5. Refunds for cancelled orders</h2>\n<p>When we confirm a cancellation, you are refunded the full amount paid for the cancelled items. If you cancel the whole order, that is everything you paid. The refund is issued within <strong>7 calendar days</strong> of our confirmation, back to the original payment method. Your bank may need extra time to show it. For more about timing, see the <a href=\"/refund-policy/\">Refund Policy</a>.</p>\n<p>If you only removed one item, only that item is refunded. If the order used a discount code, the refund matches what you actually paid for the item after the discount.</p>\n<h2>6. Cancellations by Kin Folk Tee</h2>\n<p>Occasionally we may need to cancel an order ourselves. Reasons include:</p>\n<ul>\n<li>the selected size or colour of a blank garment is no longer available and no equivalent is acceptable to you;</li>\n<li>a design cannot be printed to our standard on the chosen product;</li>\n<li>the shipping address is outside the countries we serve, or cannot be verified;</li>\n<li>a payment is flagged as suspicious by the payment provider, or cannot be confirmed;</li>\n<li>a clear pricing error on the site.</li>\n</ul>\n<p>If we cancel, we email you with the reason and refund the full amount for the affected items within 7 calendar days. Where it makes sense, we will offer you an alternative first, such as a different colour, before cancelling anything.</p>\n<h2>7. What happens to your order after you check out</h2>\n<p>Knowing the stages makes it easier to see why the first day matters so much.</p>\n<table class=\"policy-table\">\n<caption>Order stages and what can still change</caption>\n<thead>\n<tr>\n<th scope=\"col\">Stage</th>\n<th scope=\"col\">What we are doing</th>\n<th scope=\"col\">Can you still cancel or change?</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Order received</td>\n<td>Payment confirmed, confirmation email sent</td>\n<td>Yes, inside 24 hours</td>\n</tr>\n<tr>\n<td>Queued for printing</td>\n<td>Your items wait for the right press and blank</td>\n<td>Usually yes, inside 24 hours</td>\n</tr>\n<tr>\n<td>Printing</td>\n<td>The design is printed on your garment or mug</td>\n<td>Address changes only</td>\n</tr>\n<tr>\n<td>Quality check and packing</td>\n<td>We inspect each print and pack your parcel</td>\n<td>Address changes only</td>\n</tr>\n<tr>\n<td>Shipped</td>\n<td>The carrier has your parcel; tracking email sent</td>\n<td>No; return or exchange after delivery</td>\n</tr>\n</tbody>\n</table>\n<p>You can see which stage your order is in on the <a href=\"/order-tracking/\">Order Tracking</a> page. &#8220;Processing&#8221; in WooCommerce covers the first four stages; &#8220;Completed&#8221; means it has shipped.</p>\n<h2>8. Partial cancellations in larger orders</h2>\n<p>In a family order of ten or twelve pieces, it is common for one person to drop out or change their mind about a colour. You do not need to cancel the whole order. Tell us which line to remove or change, and we adjust only that item. The rest of the order continues through production as normal, so the people whose sizes are settled are not held up. If removing an item drops the order below the value needed for a discount code you used, we will explain any effect on the discount before confirming.</p>\n<h2>9. Ordering for an event</h2>\n<p>For reunions, birthdays and holiday photos, the 24-hour window is your best friend. Once you have placed the order, forward the confirmation to the family group chat and ask everyone to check their name, size and colour that same evening. Fixing a size inside the window costs nothing. Fixing it after delivery means a return and a reprint, which takes time you may not have before the event.</p>\n<h2>10. Duplicate orders</h2>\n<p>If you accidentally placed the same order twice, for example after a slow payment page, email us right away with both order numbers. Inside the 24-hour window we cancel the duplicate and refund it in full. Outside the window, if both orders have shipped, the extra items can be returned under our normal returns policy, and because the mistake was an honest one we will look at the return postage case by case.</p>\n<h2>11. Gift orders and changes requested by the recipient</h2>\n<p>If you bought something as a gift, only the person who placed the order can cancel it or change the shipping address, because the order and payment are in their name. Recipients can still exchange a size after delivery by contacting us with the order number or the buyer&#8217;s name and shipping postcode.</p>\n<h2>12. Real situations</h2>\n<h3>&#8220;I ordered an M for my teenage son, but he is definitely an L now.&#8221;</h3>\n<p>Email us within 24 hours with the order number and &#8220;change M to L&#8221;. If the order has not been printed, we switch it and confirm by email. There is no charge for this kind of change when we catch it in time.</p>\n<h3>&#8220;The reunion has been moved to next year.&#8221;</h3>\n<p>If you are inside the 24-hour window, we cancel and refund in full. If the shirts have already shipped, you can return them unworn within 60 days of delivery for a refund of the item price.</p>\n<h3>&#8220;I just saw that Grandma&#8217;s zip code is wrong.&#8221;</h3>\n<p>Write straight away. Before shipping, we correct the address. After shipping, we contact the carrier and update you within 1 business day.</p>\n<h3>&#8220;I paid with the wrong card.&#8221;</h3>\n<p>We cannot move a payment from one card to another. Inside the window, we cancel the order and refund it to the card used, and you can reorder with the right card.</p>\n<h3>&#8220;I changed my mind about the colour after the shirts were printed.&#8221;</h3>\n<p>Once a shirt has been printed, the colour cannot be changed. Let it arrive, then request an exchange within 60 days of delivery. For a change of mind, the return postage is yours and we pay to ship the new colour. If you tell us before you post the return, we can often start printing the replacement early so it reaches you sooner.</p>\n<h3>&#8220;My order confirmation never arrived. Did the order go through?&#8221;</h3>\n<p>Check your spam or promotions folder first. If there is still nothing, email us with the name and email used at checkout. We will confirm whether the order exists before you try again, so you do not end up with two of everything.</p>\n<h2>13. Contact us</h2>\n<p>Email <a href=\"mailto:support@kinfolktee.com\">support@kinfolktee.com</a> or use <a href=\"/submit-ticket/\">Submit a Ticket</a>. We reply within 1 business day. Check the status of your order any time on the <a href=\"/order-tracking/\">Order Tracking</a> page, and see the <a href=\"/faqs/\">FAQs</a> for quick answers. Kinfolktee, 208 Wynbrook Dr, Nashville, TN 37221, United States.</p>\n","visible_characters":10150,"meta_description":"Need to change a size, colour or address, or cancel? Kin Folk Tee orders can be changed within 24 hours if not shipped. See how, and how refunds work.","parent":null,"published_at":"2026-10-04T08:16:41+00:00","updated_at":"2026-10-04T08:16:41+00:00"}}